Download McGraw-Hill BIM Report | Project Delivery Systems

Posted by Daniel Hughes on May 27, 2016 8:00:00 AM

Download 60-page BIM Report:

McGraw-Hill BIM Report | Project Delivery Systems

Excerpts:

Design-Bid-Build: 38% of architects and 22% of contractors find this to be the best system to reduce project cost.

RSMeans: 2014 Report Indicates 50% of US Projects over $10M use Design-Build

Design-Build: 43% of architects and 50% of contractors find this to be the best system to reduce project schedule, and a higher percentage of owners using this method report projects finishing ahead of schedule than with the other two systems.

Construction Management at Risk: A higher percentage of owners doing projects that employ this system find that their projects that employ this system find that their projects are under budget(33%) and 60% report being very satisfied with the projects they have conducted, which is at least 20 percentage points higher than those using design-bid-build or design-build.

AGC - ConsensusDocs: May 2014 | First Federal Design-Build Agreement Makes it Easier for Design Professionals and Design-Builders to Contract on Federal Design-Build Projects

Bradley BIM Design-Build Resource Guide


 

LInks to Alternative Project Delivery System Contracts

Read More

Topics: building information modeling, download smart bim market report, design build, McGraw-Hill SmartMarket BIM Survey, business value of bim, alternate project delivery processes, contractor at risk, mcgraw hill smart market bim report, design-bid-build, design build institute of america, download smart market report, AGC ConsensusDocs, bim for construction

Download McGraw-Hill 'Measuring BIM Impact On Complex Buildings'

Posted by Daniel Hughes on Apr 15, 2016 8:00:00 AM

Download 2015 60-page BIM Report:

McGraw-Hill BIM Report | Measuring the Impact of BIM on Complex Buildings

BIM Report Contributors: 391 owners, architects, engineers and contractors indicated they had a moderate to high level knowledge on the use of BIM within their organization.

  1. 40 Owners

  2. 183 Architects

  3. 68 Engineers

  4. 100 General Contractors

Excerpts:

However, by 2015, many companies have gained deep experience with the use of BIM. Therefore, we believe the time has come to take the critical next step in the research and to establish the specific level of impact BIM has on 10 types of design and construction activities.

To do so, we asked respondents to quantify the positive impact of BIM for six specific metricsthat could be measured in terms of percentage of improvement. The research focuses specifically on complex projects because they offer the best opportunity to experience the powerful benefits BIM provides.

These 10 Activities of Planning, Design and Construction defined the real Impact of BIM on Key Outcomes for Complex Projects:

  1. BIM Impact on Owner Engagement and Understanding

  2. BIM Impact on Design

  3. BIM Impact on Documentation and Constructability

  4. BIM Impact on Estimating and Bidding

  5. BIM Impact on Construction Phasing and Logistics

  6. BIM Impact on Contractors' Understanding of Design Intent

  7. BIM Impact on Cost Control and Reduction

  8. BIM Impact on Schedule and Project Duration

  9. BIM Impact on Unplanned Changes, Rework and Out-of-Sequence Work

  10. BIM Impact on Labor, Safety and Material Waste

6 Metrics for the Impact of BIM on Complex Projects

Read More

Topics: building information modeling, download smart bim market report, McGraw-Hill SmartMarket BIM Survey, bim for design build, business value of bim, alternate project delivery processes, contractor at risk, mcgraw hill smart market bim report, design build institute of america, download smart market report, BIM, AGC ConsensusDocs, bim for construction

Skanska Revit-MEP Prefabrication | New Assembly Line Efficiency

Posted by Daniel Hughes on Apr 6, 2016 3:30:00 PM

Similar to Henry Ford's revolutionary assembly line processes; BIM processes are reshaping the MEP design and construction (manufacturing) processes for facility projects.

Ford's automated automobile assembly-line process; reduced labor time & costs, while reducing material waste with modular, standardized parts.

Sheer production of the Model T dramatically increased. The production time for a single car dropped from over twelve hours to just 93 minutes due to the introduction of the assembly line.

Skanska Construction's BIM MEP Prefabrication construction processes are highlighted online via Tradeline with an insightful, visual article;

Building Blocks: Offsite Prefabrication Saves Time and Money -- Compressed Work Schedules, Worker Safety, and Access to Constrained Sites Top Benefits

Several maturing, project delivery processes are integrated to produce more efficient, 'manufacturing-oriented' design and construction processes.

Read More

Topics: automobile assembly line, Skanska Construction, Government Revit BIM, Bradley BIM, Ford assembly line, Construction Revit BIM, bim modular prefabrication, design and construction, Revit-BIM Trends, design build institute of america, Owners Revit BIM, Lean Construction, bim mep prefabrication

Dan_Hughes_pic.jpg

Daniel Hughes

Welcome to the Bradley BIM resource portal supporting the Bradley Revit Library of 1,000 Families

1000px-Rss-feed.svg.png RSS Feed

Subscribe to Blog Updates

Subscribe to the BIM Quarterly Newsletter

Recent Posts

Categories

see all